陳盈彥
狀態 專任
姓名 陳盈彥
電子郵件
聯絡電話 5716
職稱 教授
最高學歷 國立清華大學工業工程與工程管理博士
專業領域 生產管理、系統模擬、先進規劃與排程、智慧製造、工廠現場改善
年度 論文名稱
2026 Tzu-Li Chen, James C. Chen, Yin-Yann Chen, Chia-Hsin Tsou, Adaptive large neighborhood search for the pickup and delivery problem with nonlinear charging and load-dependent discharging using autonomous mobile robots, Flexible Services and Manufacturing Journal, May. 2026
2025 Tzu-Li Chen, James C. Chen, Yin-Yann Chen, Yu-Jie Chang, The optimal configuration for various placement machines in PCB assembly lines, Annals of Operations Research, pp. 365-396, Jun. 2025
2025 James C. Chen, Tzu-Li Chen, Yin-Yann Chen, Yung-Hsin Su, Applying a modified adaptive large neighborhood search for truck scheduling and pile assignment in a two-stage sorting system, European Journal of Industrial Engineering, pp. 128-161, Mar. 2025
2024 James C. Chen, Tzu-Li Chen, Yin-Yann Chen, Min-Yu Chung, Multi-resource constrained scheduling considering process plan flexibility and lot streaming for the CNC machining industry, Flexible Services and Manufacturing Journal, pp. 946-993, Sep. 2024
2024 Yin-Yann Chen, Pourya Pourhejazy, Tzu-Ning Liu, Line balancing problem with multi-manned workstations and resource constraints: The case of electronics waste disassembly, Cleaner Logistics and Supply Chain, pp. 100129-, Mar. 2024
2023 Yin-Yann Chen, Tzu-Li Chen, Chun-Chih Chiu, Yi-Jia Wu, A multi-trip vehicle routing problem considering time windows and limited duration under a heterogeneous fleet and parking constraints in cold supply chain logistics, Transportation Planning and Technology, pp. 335-358, Mar. 2023
2022 James C. Chen, Yin-Yann Chen, Tzu-Li Chen, Yu-Chia Yang, An adaptive genetic algorithm-based and AND/OR graph approach for the disassembly line balancing problem, Engineering Optimization, pp. 1583-1599, Sep. 2022
2022 James C. Chen, Yin-Yann Chen, Tzu-Li Chen, Yi-Hsuan Lin, Multi-project scheduling with multi-skilled workforce assignment considering uncertainty and learning effect for large-scale equipment manufacturer, Computers & Industrial Engineering, pp. 108240-, Jul. 2022
2022 Chen-Yang Cheng, Yin-Yann Chen, Pourya Pourhejazy, Chih-Yu Lee, Disassembly Line Balancing of Electronic Waste Considering the Degree of Task Correlation, Electronics, pp. 533-, Feb. 2022
2019 James C. Chen, Yin-Yann Chen, Tzu-Li Chen, Yi-Hsin Kuo, Applying two-phase adaptive genetic algorithm to solve multi-model assembly line balancing problems in TFT-LCD module process, Journal of Manufacturing Systems, pp. 86-99, Jul. 2019
2018 Yin-Yann Chen, Chen-Yang Cheng, Jia-Ying Li, Resource-constrained assembly line balancing problems with multi-manned workstations, Journal of Manufacturing Systems, pp. 107-119, Jul. 2018
2017 James C. Chen, Yin-Yann Chen, Tzu-Li Chen, Jim Z. Lin, Comparison of Simulated Annealing and Tabu-Search Algorithms in Advanced Planning and Scheduling System for TFT-LCD Color Filter Fabs, International Journal of Computer Integrated Manufacturing, pp. 516-534, Mar. 2017
2017 Yin-Yann Chen, A hybrid algorithm for allocating tasks, operators, and workstations in multi-manned assembly lines, Journal of Manufacturing Systems, pp. 196-209, Jan. 2017
2016 James C. Chen, Yin-Yann Chen, Yu Liang, Application of a genetic algorithm in solving the capacity allocation problem with machine dedication in the photolithography area, Journal of Manufacturing Systems, pp. 165-177, Oct. 2016
2015 Chen-Yang Cheng, Yin-Yann Chen, Tzu-Li Chen, John Jung-Woon Yoo, Using a hybrid approach based on the particle swarm optimization and ant colony optimization to solve a joint order batching and picker routing problem, International Journal of Production Economics, pp. 805-814, Dec. 2015
2015 Yin-Yann Chen, Hsiao-Yao Fan, An application of stochastic programming in solving capacity allocation and migration planning problem under uncertainty, Mathematical Problems in Engineering, pp. 1-16, Dec. 2015
2015 Tzu-Li Chen, Chen-Yang Cheng, Yin-Yann Chen, Li-Kai Chan, An efficient hybrid algorithm for integrated order batching, sequencing and routing problem, International Journal of Production Economics, pp. 158-167, Jan. 2015
2014 Cheng, Chen-Yang, Ou, Tsung-Yin, Chen, Tzu-Li, Chen, Yin-Yann, Transferring cognitive apprenticeship to manufacturing process knowledge management system: A case study of small- and medium-sized coating industry, VINE: The journal of information and knowledge management systems, pp. 420-444, Oct. 2014
2014 Li-Chih Wang, Yin-Yann Chen, Tzu-Li Chen, Chen-Yang Cheng, Chin-Wei Chang, A Hybrid Flowshop Scheduling Model Considering Dedicated Machines and Lot-splitting for the Solar Cell Industry, International Journal of Systems Science, pp. 2055-2071, Oct. 2014
2014 Yin-Yann Chen, The order fulfillment planning problem considering multi-site order allocation and single-site shop floor scheduling, Journal of Intelligent Manufacturing, pp. 441-458, Jun. 2014
2014 Chen-Yang Cheng, Tzu-Li Chen, Yin-Yann Chen, An Analysis of the Structural Complexity of Supply Chain Networks, Applied Mathematical Modelling, pp. pp.2328–2344-, May. 2014
2014 Chen, Yin-Yann, Fan, Hsiao-Yao, Shih, Chiung-Wen, Huang, Po-Han , The capacity planning problem considering the procurement of bottleneck machines and auxiliary tools, Lecture Notes in Engineering and Computer Science, Mar. 2014
2013 Tzu-Li Chen, Yin-Yann Chen, Hao-Chun Lu, A capacity allocation and expansion model for TFT-LCD multi-site manufacturing, Journal of Intelligent Manufacturing, pp. 847-872, Aug. 2013
2013 Chen-Yang Cheng, Tzu-Li Chen, Li-Chih Wang, Yin-Yann Chen, A genetic algorithm for the multi-stage and parallel-machine scheduling problem with job splitting – A case study for the solar cell industry, International Journal of Production Research, pp. 4755-4777, Aug. 2013
2013 Yin-Yann Chen, Tzu-Li Chen, Cheng-Dar Liou, Medium-term Multi-plant Capacity Planning Problems Considering Auxiliary Tools for the Semiconductor Foundry, International Journal of Advanced Manufacturing Technology, pp. 1213-1230, Feb. 2013
2013 Cheng-Dar Liou, Yi-Chih Hsieh, Yin-Yann Chen, A new encoding scheme-based hybrid algorithm for minimising two-machine flow-shop group scheduling problem, International Journal of Systems Science, pp. pp.77–93-, Jan. 2013
2013 Yin-Yann Chen, Chen-Yang Cheng, Li-Chih Wang, Tzu-Li Chen, A hybrid approach based on the variable neighborhood search and particle swarm optimization for parallel machine scheduling problems– a case study for solar cell industry, International Journal of Production Economics, pp. 66-78, Jan. 2013
2012 Yin-Yann Chen, The Medium-Term Capacity Planning Problem for TFT-LCD Industry: An Application of Fuzzy Bilevel Programming, International Journal of Future Computer and Communication, pp. pp. 79–82-, Jun. 2012
2011 Yin-Yann Chen, James T. Lin, Tzu-Li Chen, A two-phase dynamic dispatching approach to semiconductor wafer testing, Robotics and Computer-Integrated Manufacturing, pp. pp.889–901-, Oct. 2011
2010 羅明琇、陳盈彥、林則孟, 神腦國際—One Stop Service, 管理評論, pp. 87-103, Apr. 2010
2010 陳盈彥、郭盈賢, 陣列廠光罩重新配置於瓶頸機台之研究分析, 國立虎尾科技大學學報, pp. 1-10, Mar. 2010
2009 Sonia M. Lo、Yin-Yann Chen、James T. Lin, One Stop Service– The Case of Senao International Co., LTD., International Journal of Electronic Business Management, pp. pp. 225–240-, Dec. 2009
2009 Yin-Yann Chen、James T. Lin, A modified particle swarm optimization for production planning problems in the TFT Array process, Expert Systems with Applications, pp. pp.12264–12271-, Dec. 2009
2009 林則孟, 蔡建基, 陳盈彥, 陳子立, 考量等候時間限制之半導體爐管機台派工法則, 先進工程學刊, pp. 273-278, Jul. 2009
2008 Yin-Yann Chen、James T. Lin, Hierarchical Multi-Constraint Production Planning Problem Using Linear Programming and Heuristics, Journal of the Chinese Institute of Industrial Engineers, pp. pp. 347–357-, Oct. 2008
2007 James T. Lin、Yin-Yann Chen, A Multi-site Supply Network Planning Problem Considering Variable Time Buckets- A TFT-LCD Industry Case, International Journal of Advanced Manufacturing Technology, pp. pp.1031–1044-, Jul. 2007
2005 James T. Lin、Yin-Yann Chen, A Multi-Site Planning Approach for the TFT-LCD Production Chain, International Journal of Electronic Business Management, pp. pp. 193–201-, Sep. 2005
年度 論文名稱
2026 多溫層冷鏈物流共同配送之最佳化研究, 2026財務金融與管理研討會, Mar. 13, 2026, TWN臺灣
2026 考量燃油成本之異質車隊多趟次配送最佳化, 2026財務金融與管理研討會, Mar. 13, 2026, TWN臺灣
2025 陳盈彥、陳冠妤, 半導體封裝廠產能規劃與機台配置最佳化之研究, 2025全國管理實務暨學術研討會, Apr. 23, 2025, TWN臺灣
2025 陳盈彥、曾朝鴻, 考量需求不確定性之跨廠區產能擴充與最佳化規劃, 2025全國管理實務暨學術研討會, Apr. 23, 2025, TWN臺灣
2023 陳盈彥, 徐婕瑀, 考慮燃油消耗與碳排成本下物流車輛配送路線之研究, 第十九屆台灣作業研究學會年會暨國際研討會, Nov. 30, 2023, TWN中華民國(臺灣)
2023 陳盈彥, 洪怡婷, 應用隨機規劃模式求解旅行時間不確定之城市物流配送規劃, 第十九屆台灣作業研究學會年會暨國際研討會, Nov. 30, 2023, TWN中華民國(臺灣)
2023 陳盈彥, 郭妤倢, 應用適應性數據驅動方法於城市物流配送車輛路線問題之研究, 第十九屆台灣作業研究學會年會暨國際研討會, Nov. 30, 2023, TWN中華民國(臺灣)
2023 陳盈彥、陳姿宇, 考慮燃油消耗成本下多趟次多艙種物流配送路徑之最佳化模型研究, 2023工商與公共管理學術研討會, Jun. 08, 2023, TWN中華民國(臺灣)
2023 陳盈彥、謝仁杰, 應用精實生產與限制理論於製造流程改善之研究-以雲林某醬油工廠為例, 2023工商與公共管理學術研討會, Jun. 08, 2023, TWN中華民國(臺灣)
2023 陳盈彥、張文, 應用價值溪流圖與模擬技術改善蛋糕生產線作業流程之研究, 2023工商與公共管理學術研討會, Jun. 08, 2023, TWN中華民國(臺灣)
2022 陳盈彥、林育翎, A novel mathematical model of vehicle dispatching strategies for distribution centers with multiple trips, multiple compartments, and time window constraints, 2022工業管理與危機管理學術研討會, May. 20, 2022, TWN中華民國(臺灣)
2021 陳盈彥、蕭守心, 具時窗限制之多趟次多艙種車輛途程問題, 2021北商大學術論壇經營與管理實務研討會, Dec. 09, 2021, TWN中華民國(臺灣)
2020 吳怡佳, 陳盈彥, 具時窗之多趟次車輛途程問題, 中國工業工程學會年會暨研討會, Nov. 20, 2020, TWN中華民國(臺灣)
2020 張晉, 陳盈彥, 具有不同拆卸作業關聯度下之多人工作站拆卸線平衡問題, 中國工業工程學會年會暨研討會, Nov. 20, 2020, TWN中華民國(臺灣)
2020 劉子寧, 陳盈彥, 資源限制下考慮工作熟練度之多人工作站拆卸線平衡問題, 中國工業工程學會年會暨研討會, Nov. 20, 2020, TWN中華民國(臺灣)
2020 林宜萱, 陳盈彥, 冷鏈物流車配送路徑規劃與派車最佳化問題之研究, 2020財務金融與管理研討會, Mar. 13, 2020, TWN中華民國(臺灣)
2020 Yin-Yann Chen, The disassembly line balancing problem considering work relatedness, 3rd International Conference on Computers in Management and Business (ICCMB2020), Jan. 30-Feb. 01, 2020, JPN日本
2019 陳盈彥, 陳俞安, 考慮操作員工作熟練度下之拆卸線生產平衡問題, 中國工業工程學會年會暨研討會, Nov. 22, 2019, TWN中華民國(臺灣)
2019 李芷毓, 陳盈彥, 考量工作關聯度之拆卸線生產平衡問題, 中國工業工程學會年會暨研討會, Nov. 22, 2019, TWN中華民國(臺灣)
2019 Yin-Yann Chen, Tzu-Yu Hung, Using a Two-Stage Stochastic Programming Model to Solve the Sustainable Supply Chain Network Design under Uncertainty, 2nd International Conference on Innovative Applications in Engineering Technology and Applied Sciences, May. 24-25, 2019, JPN日本
2019 陳盈彥, 邱榮書, 多產品之多人工作站生產線平衡問題研究, 2019全球商業經營管理學術研討會, Apr. 24, 2019, TWN中華民國(臺灣)
2018 Yin-Yann Chen, Modeling and solving multi-manned assembly line balancing problems with resource constraints, Global Conference on Innovative Strategies in Information Technology and Engineering Management, Apr. 20-21, 2018, JPN日本
2018 Yin-Yann Chen, James C. Chen, Yu-Chia Yang, Chien-Fu Huang, Applying Adaptive Genetic Algorithm and AND/OR Graph to Disassembly Line Balancing Problems, International Symposium on Business and Management, Mar. 31-Apr. 02, 2018, JPN日本
2018 Yin-Yann Chen, James C. Chen, Yi-Hsin Kuo, Hao-Ning Wu, A Study of Multi-Model Assembly Line Balancing Problem for TFT-LCD Module Process, International Symposium on Business and Management, Mar. 31-Apr. 02, 2018, JPN日本
2017 李芋瑩, 陳盈彥, 以人員配置效益為目標之多人工作站生產線平衡問題, 中國工業工程學會年會暨研討會, Dec. 15, 2017, TWN中華民國(臺灣)
2017 黃大銘, 陳盈彥, 應用遺傳演算法求解資源限制下多人工作站生產線平衡問題之研究, 中國工業工程學會年會暨研討會, Dec. 15, 2017, TWN中華民國(臺灣)
2017 黃紹茹, 陳盈彥, 考慮作業員配置效益之多人工作站生產線平衡問題, 現代管理與創新國際學術研討會, Apr. 27, 2017, TWN中華民國(臺灣)
2017 陳盈彥, 李佳嫈, 考慮資源限制下多人工作站生產線平衡問題之模型, 工程技術、管理科學與教育研討會, Apr. 13, 2017, TWN中華民國(臺灣)
2017 Yin-Yann Chen, Optimal Resource Configuration and Allocation Planning Problem for Bottleneck Machines and Auxiliary Tools, International Symposium on Business and Management, Apr. 03-05, 2017, JPN日本
2016 Yin-Yann Chen, A Stochastic Programming Model to Solve the Capacity Expansion Problem Considering Auxiliary Tools: A Semiconductor Foundry Case, International Symposium on Business and Social Sciences (ISBSS), Aug. 01-03, 2016, JPN日本
2015 陳盈彥, 沈家豪, 紡織成衣業考量成本因素下生產線平衡問題, 彰雲嘉大學校院聯盟學術研討會, Dec. 10, 2015, TWN中華民國(臺灣)
2015 Yin-Yann Chen, James C. Chen, Chieh-Ying Lin, Yu-Xuan Lin, A Genetic Algorithm for Type-E Assembly Line Balancing Problem in Footwear Industry, The 16th Asia Pacific Industrial Engineering and Management Systems Conference (APIEMS 2015), Dec. 07-10, 2015, VNM越南社會主義共和國(越南)
2015 Yin-Yann Chen, James C. Chen, Chun-Ju Lin, Hsin-Yu Shih, Type-III Assembly Line Balancing Problem in Footwear Industry, The 16th Asia Pacific Industrial Engineering and Management Systems Conference (APIEMS 2015), Dec. 07-10, 2015, VNM越南社會主義共和國(越南)
2015 Yin-Yann Chen, James C. Chen, Yi-Hsin Hu, Qi Hua, Apply Grouping Genetic Algorithm to Develop an Assembly Line Balancing System for Apparel Industry, The 16th Asia Pacific Industrial Engineering and Management Systems Conference (APIEMS 2015), Dec. 07-10, 2015, VNM越南社會主義共和國(越南)
2015 Yin-Yann Chen, The capacity allocation and migration planning problem in the semiconductor packaging and testing industry, International Conference on Business and Social Sciences (ICBASS), Mar. 21-23, 2015, JPN日本
2014 陳盈彥, 邱達暐, 應用兩階段隨機規劃探討半導體封裝產業之產能規劃問題, 2014北商學術論壇-國際經營與管理研討會, Dec. 18, 2014, TWN中華民國(臺灣)
2014 Yin-Yann Chen, Hsiao-Yao Fan, Chiung-Wen Shih, Po-Han Huang, The Capacity Planning Problem Considering the Procurement of Bottleneck Machines and Auxiliary Tools, IAENG International Conference on Industrial Engineering (ICINDE'14), Mar. 11-13, 2014, HKG香港
2013 陳盈彥, 施瓊雯, 產能配置與搬移規劃問題之研究-以半導體封裝測試產業為例, 中國工業工程學會年會暨研討會, Dec. 06, 2013, TWN中華民國(臺灣)
2013 陳盈彥, 范筱瑤, 應用隨機規劃模式求解具有不確定性之產能配置與搬移規劃問題, 中國工業工程學會年會暨研討會, Dec. 06, 2013, TWN中華民國(臺灣)
2013 陳盈彥, 黃柏翰, 綠色供應鏈網路設計問題之兩階段隨機規劃模式, 2013彰雲嘉大學校院聯盟學術研討會, Dec. 05, 2013, TWN中華民國(臺灣)
2013 Chun-Hsiung Lai, Tzu-Li Chen, Yin-Yann Chen, Chen-Yang Cheng, An efficient hybrid algorithm for integrated order batching, sequencing and routing problem, The 14th Asia Pacific Industrial Engineering and Management Systems Conference (APIEMS 2013), Dec. 02-05, 2013, PHL菲律賓共和國
2013 Li-Chih Wang, Tzu-Li Chen, Yin-Yann Chen, Hsin-Yuan Miao, Sheng-Chieh Lin, Shuo-Tsung Chen, Genetic Algorithm Approach for Multiobjective Optimization of Closed-loop Supply Chain Network, The Institute of Industrial Engineers (IIE) Asian Conference, Jul. 17-19, 2013, TWN中華民國(臺灣)
2013 Li-Chih Wang, Tzu-Li Chen, Yin-Yann Chen, Yi-Wen Chen, Allen Wang, Closed-Loop Sustainable Supply Chain Design under Uncertainties, the 23rd International Conference on Flexible Automation and Intelligent Manufacturing, Jun. 25-27, 2013, PRT葡萄牙共和國
2013 Yin-Yann Chen, Chiung-Wen Shih, Hsiao-Yao Fan, The multi-site order fulfillment planning model: a global corporation case study, International Conference on Global Business Environment, Jun. 21-22, 2013, THA泰王國(泰國)
2012 王立志, 陳盈彥, 蔡忠軒, 李承玫, 考量碳排放之綠色供應鏈生產規劃模式-以矽晶太陽能電池產業為例, 中國工業工程學會年會暨研討會, Dec. 14, 2012, TWN中華民國(臺灣)
2012 陳盈彥, 陳姿伶, 陳建銘, 半導體封裝測試產業之產能配置模式, 中國工業工程學會年會暨研討會, Dec. 14, 2012, TWN中華民國(臺灣)
2012 陳盈彥, 洪子育, 應用兩階段隨機規劃模式求解具有不確定性之永續供應鏈網路設計問題, 中國工業工程學會年會暨研討會, Dec. 14, 2012, TWN中華民國(臺灣)
2012 Li-Chih Wang, Chen-Yang Cheng, Tzu-Li Chen, Yin-Yann Chen, Chung-Chun Wang, A Multi-Stage and Parallel-Machine Scheduling Problem for Solar Cell Industry, International Asia Conference on Industrial Engineering and Management Innovation, Aug. 09-10, 2012, CHN大陸地區(大陸)
2012 Li-Chih Wang, Chen-Yang Cheng, Tzu-Li Chen, Yin-Yann Chen, An Integrated Algorithm for Solar Cell Hybrid Flow Shop Scheduling, International Conference on Flexible Automation and Intelligent Manufacturing (FAIM 2012), Jun. 09-12, 2012, FIN芬蘭共和國
2012 Yin-Yann Chen, The Medium-Term Capacity Planning Problem for TFT-LCD Industry: An Application of Fuzzy Bilevel Programming, International Conference on Fuzzy Information and Engineering (ICFIE 2012), Jun. 01-02, 2012, HKG香港
2012 Li-Chih Wang, Yin-Yann Chen, Chen-Yang Cheng, Chin-Wei Chang, Chung-Hsuan Tsai, An optimal production scheduling model of hybrid flow shop—a case of solar cell industry, 23rd Annual Production and Operations Management Society (POMS) Conference, Apr. 26-29, 2012, USA美國
2012 陳盈彥, 林玉姍, 應用二階規劃求解中期產能規劃問題之研究-以晶圓代工廠為例, 2012財金會計暨商管決策國際研討會, Mar. 22, 2012, TWN中華民國(臺灣)
2012 陳盈彥, 徐詩婷, 考慮擴充瓶頸機台與附屬工具之隨機產能規劃問題, 2012產業創新與經營學術研討會, Mar. 15, 2012, TWN中華民國(臺灣)
2011 陳盈彥, 吳伯軒, 應用二階規劃求解中期產能規劃問題之研究-以TFT-LCD產業為例, 中國工業工程學會年會暨研討會, Dec. 09, 2011, TWN中華民國(臺灣)
2011 陳盈彥, 徐詩婷, 應用TOPSIS於台灣太陽能產業經營績效之研究, 2011第十屆北商學術論壇-經營與管理研討會, Dec. 01, 2011, TWN中華民國(臺灣)
2011 Yin-Yann Chen, Tzu-Li Chen, Wei-Ling Chen, The Capacity Allocation Planning and Expansion Policy Problems Considering Auxiliary Tools, International Conference on System Science and Engineering, Jun. 07-09, 2011, MAC澳門
2010 陳盈彥, 陳韋伶, 考慮擴充瓶頸機台與附屬工具之中期產能規劃問題, 中國工業工程學會年會暨研討會, Dec. 24, 2010, TWN中華民國(臺灣)
2010 James T. Lin, Tzu-Li Chen, Yin-Yann Chen, Jeffrey J. Lai, A Design Methodology for SCOR-Based Supply Chain Simulation, "仿真科學與技術"學術研討會, Oct. 31-Nov. 02, 2010, CHN大陸地區(大陸)
2010 James T. Lin, Yin-Yann Chen, Tzu-Li Chen, 半導體測試廠測試機台動態排程研究, "仿真科學與技術"學術研討會, Oct. 31-Nov. 02, 2010, CHN大陸地區(大陸)
2010 James T. Lin, Tzu-Li Chen, Yin-Yann Chen, Medium-term Multi-plant Capacity Planning Problems for Semiconductor Foundry, IEEE The 17th International Conference on Industrial Engineering and Engineering Management, Oct. 28-30, 2010, CHN大陸地區(大陸)
2010 Yin-Yann Chen, An Analytical Framework for Multi-Site Supply Chain Planning Problems, International Conference on Innovation, Engineering Management and Technology, May. 25-27, 2010, JPN日本
2010 陳盈彥, 陳韋伶, 應用TOPSIS於我國TFT-LCD產業經營效率之研究, 2010現代管理與創新學術暨TOC限制管理研討會, Apr. 15, 2010, TWN中華民國(臺灣)
2010 Yin-Yann Chen, A production planning problem solved by the particle swarm optimization, The IAENG International Conference on Industrial Engineering, Mar. 16-18, 2010, HKG香港
2010 陳盈彥, 吳伯軒, 應用層級分析法與灰關聯建構電影院顧客滿意度評比模式-以西門町地區為例, 2010資訊與管理應用研討會, Mar. 15, 2010, TWN中華民國(臺灣)
2009 陳盈彥, 王宏軒, 郭盈賢, 陣列廠迴流生產環境中光罩與機台配置問題之研究, 中國工業工程學會年會暨研討會, Dec. 11, 2009, TWN中華民國(臺灣)
2009 服務深度與廣度的提升-神腦國際案例, 第十五屆服務業管理研討會, Dec. 03, 2009, TWN中華民國(臺灣)
2009 創新服務,準確無誤-神腦國際案例, 產業電子化產學合作研討會, Sep. 24, 2009, TWN中華民國(臺灣)
2008 晶圓代工廠多廠區之中期產能規劃問題, 中國工業工程學會年會暨研討會, Dec. 12, 2008, TWN中華民國(臺灣)
2008 考量等候時間限制之半導體爐管機台派工法, 中國工業工程學會年會暨研討會, Dec. 12, 2008, TWN中華民國(臺灣)
2008 Multi-site planning problem: A TFT-LCD industry case study, International Conference on Business and Information (BAI2008), Jul. 06-08, 2008, KOR大韓民國(南韓)
2008 The analysis of different production planning decision models in the supply chain network, IAENG International Conference on Industrial Engineering (ICINDE'08), Mar. 18-20, 2008, HKG香港
2007 Hierarchical Production Chain Planning Problem Based on Multi-constraints, The 8th Asia Pacific Industrial Engineering & Management Systems Conference (APIEMS) and 2007 Chinese Institute of Industrial Engineers Conference, Dec. 08-11, 2007, TWN中華民國(臺灣)
2006 多廠區供應網路規劃之研究, 中國工業工程學會年會暨研討會, Dec. 22, 2006, TWN中華民國(臺灣)
2006 Hierarchical Multi-Site Production Chain Planning— A TFT-LCD Industry Case, The 36th International Conference on Computers and Industrial Engineering (ICCIE), Jun. 19-22, 2006, TWN中華民國(臺灣)
2005 A Supply Network Planning Problem in a Multi-stage and Multi-site Environment, The 35th International Conference on Computers and Industrial Engineering (ICCIE), Jun. 18-21, 2005, TUR土耳其共和國
2004 多廠區生產規劃問題之分析, 中國工業工程學會年會暨研討會, Dec. 17, 2004, TWN中華民國(臺灣)
2004 階層式供應鏈多廠區生產規劃方法, 中國工業工程學會年會暨研討會, Dec. 17, 2004, TWN中華民國(臺灣)
2004 多階段供應鏈之整合性生產規劃與排程架構, 產業電子化運籌管理學術暨實務研討會, Jun. 03, 2004, TWN中華民國(臺灣)
2003 TFT-LCD多廠區生產鏈之生產規劃架構, 產業電子化運籌管理學術暨實務研討會, Jul. 11, 2003, TWN中華民國(臺灣)
2002 James T. Lin, Wu-Der Jeng, Chih-Hao Su, Yin-Yann Chen, Scheduling algorithm based on DBR approach for IC test facility, The 4th Asia Pacific Industrial Engineering & Management Systems Conference (APIEMS), Dec. 17-19, 2002, TWN中華民國(臺灣)
2002 Lieh-Chang Tai, James T. Lin, Wu-Der Jeng, Yin-Yann Chen, A Dynamic Dispatching Algorithm (DDA) for Semiconductor Wafer Probing, International Conference on eCommerce Engineering (ICeCE), Sep. 18-20, 2002, CHN大陸地區(大陸)
年度 書名
2012 羅明琇, 陳盈彥, 林則孟, 神腦國際—一站式服務(台灣運籌管理案例), 中國人民大學出版社, 978-7-300-14923-3, Jan. 2012
計畫類別 年度 計畫名稱 職稱/擔任之工作 計畫期間
企業產學計畫(含公營及私人企業) 2026 ACS-生產資訊數位化與產線整合實務研究 主持人 2026.06 ~ 2026.12
政府其他案件 2025 114學年度教育部教學實踐研究計畫-翻轉作業研究教學:從問題到解決的學習實踐與合作策略 主持人 2025.07 ~ 2026.07
政府學術研究計畫-科技部專題研究計畫 2022 科技部111年度【考慮油耗因素與時間相依特性下多趟次多艙種具時窗限制之城市物流規劃】 主持人 2022.07 ~ 2023.07
政府學術研究計畫-科技部專題研究計畫 2021 科技部110年度【應用適應性資料驅動方法於冷鏈智慧物流之車輛路徑規劃研究】 主持人 2021.07 ~ 2022.07
其他單位產學計畫 2020 金屬機電智機化暨人才扎根分項計畫-智慧機械產業導入精實供應鏈串接整合人工智慧前置作業產學合作計畫 共同(協同)主持人 2020.01 ~ 2020.12
政府學術研究計畫-科技部專題研究計畫 2019 科技部108年度 【 應用人工智慧演算法求解具資源限制之拆卸線生產平衡問題研究(I) 】 主持人 2019.07 ~ 2020.07
政府學術研究計畫-科技部專題研究計畫 2018 科技部107年度 【 應用隨機規劃模式求解需求不確定性下資源擴充之產能規劃問題(I) 】 主持人 2018.07 ~ 2019.07
政府學術研究計畫-科技部專題研究計畫 2017 科技部106年度 【 永續供應鏈網路設計問題之多目標隨機規劃模式應用(I) 】 主持人 2017.07 ~ 2018.07
政府學術研究計畫-科技部專題研究計畫 2016 科技部105年度 【 多人工作站組裝生產線平衡問題之研究(I) 】學門名稱:生產系統規劃與管制 主持人 2016.07 ~ 2017.07
政府學術研究計畫-國科會專題研究計畫 2015 科技部104年度 【 應用模糊二階規劃求解分散式階層結構下之產能規劃問題研究(I) 】 主持人 2015.07 ~ 2016.07
政府學術研究計畫-科技部專題研究計畫 2014 科技部103年度 【 不確定環境下應用隨機規劃模式求解產能配置與搬移規劃問題(I) 】(學門名稱:生產系統規劃與管制) 主持人 2014.07 ~ 2015.07
政府學術研究計畫-國科會專題研究計畫 2013 國科會101年度 【 多廠區生產環境下之兩階段訂單滿足規劃流程研究 】(第二年) 主持人 2013.07 ~ 2014.07
政府學術研究計畫-國科會專題研究計畫 2012 國科會101年度 【 多廠區生產環境下之兩階段訂單滿足規劃流程研究 】2年期 主持人 2012.07 ~ 2014.07
政府學術研究計畫-國科會專題研究計畫 2011 考量副資源限制與迴流生產環境下之兩階段現場排程方法(I) 主持人 2011.07 ~ 2012.07
政府學術研究計畫-國科會專題研究計畫 2010 混合拉式與推式生產策略之供應網路規劃-以面板產業為例(I) 主持人 2010.07 ~ 2011.07
企業產學計畫(含公營及私人企業) 2009 彰源公司生產現場合理化與改善案 共同(協同)主持人 2009.05 ~ 2010.05
政府學術研究計畫-國科會專題研究計畫 2008 層級式供應鏈生產規劃之研究-以面板製造商為例 主持人 2008.07 ~ 2010.07
國家 學校名稱 系所 學位
國立清華大學 工業工程與工程管理研究所 碩士
國立清華大學 工業工程與工程管理研究所 博士
國立清華大學 工業工程與工程管理學系 學士
年度 獎項名稱 頒獎單位
2025 113學年度【物流運籌認證教學成效績優】 中華民國物流協會
2024 112學年度【物流運籌認證教學成效績優】 中華民國物流協會
2023 111學年度【物流運籌認證教學成效績優】 中華民國物流協會
2020 108學年度【物流運籌認證教學成效績優】 中華⺠國物流協會
服務名稱 服務性質 服務單位 參與情形 地點 服務起始日 服務結束日
校務會議教師代表 其他 國立虎尾科技大學 2020-07-31 2021-07-30
學生申訴評議委員會委員 其他 國立虎尾科技大學 2020-07-31 2021-07-30
校研究發展成果推動委員會 其他 國立虎尾科技大學 2020-07-31 2021-07-30
院教評會委員代表 其他 國立虎尾科技大學 2020-07-31 2021-07-30
系教評會委員 其他 國立虎尾科技大學 2020-07-31 2021-07-30
系專業證照審查委員 其他 國立虎尾科技大學 2020-07-31 2021-07-30
系學會指導老師 其他 國立虎尾科技大學 2020-07-31 2021-07-30
系預備研究生甄選委員會委員 其他 國立虎尾科技大學 2020-07-31 2021-07-30
全國工業工程與管理碩士論文競賽評審委員 其他 中國工業工程學會 2020-07-08 2020-07-08
專業課程講師 其他 國立虎尾科技大學進修推廣部推廣教育中心八十學分班 2020-03-01 2020-07-03
小型企業人力提升計畫輔導顧問 擔任校外公民營機構顧問或委員 勞動部勞動力發展署中彰投分署 2019-01-16 2019-12-30
全國工業工程與管理碩士論文競賽評審委員 其他 中國工業工程學會 2019-06-26 2019-06-26
系課程委員會 其他 國立虎尾科技大學 2019-07-31 2020-07-30
系教評會 其他 國立虎尾科技大學 2019-07-31 2020-07-30
校研究發展成果推動委員會 其他 國立虎尾科技大學 2019-07-31 2020-07-30
系務發展諮詢委員會 其他 國立虎尾科技大學 2019-07-31 2020-07-30
系儀器設備審查委員 其他 國立虎尾科技大學 2019-07-31 2020-07-30
系招生甄選小組成員 其他 國立虎尾科技大學 2019-07-31 2020-07-30
2019全國大專暨高中職學生專題製作競賽評審委員 其他 國立虎尾科技大學 2019-11-19 2019-11-19
校導師(學務)會議代表 其它 國立虎尾科技大學 2018-07-31 2019-01-30
教師申訴評議委員會委員 其它 國立虎尾科技大學 2018-01-31 2019-07-30
院務會議委員代表 其它 國立虎尾科技大學 2018-07-31 2019-07-30
院教評會委員代表 其它 國立虎尾科技大學 2018-07-31 2019-07-30
院教師評鑑委員代表 其它 國立虎尾科技大學 2018-07-31 2019-07-30
系教評會委員 其它 國立虎尾科技大學 2018-07-31 2019-07-30
系導師會議委員 其它 國立虎尾科技大學 2018-07-31 2019-07-30
小型企業人力提升計畫授課 其他 陞煇食品股份有限公司 2018-08-04 2018-08-04
院績優導師教師代表 其它 國立虎尾科技大學 2017-07-31 2018-07-30
院教學優良教師遴選委員代表 其它 國立虎尾科技大學 2017-07-31 2018-07-30
系課程委員會委員 其它 國立虎尾科技大學 2017-07-31 2018-07-30
校務會議委員代表 其它 國立虎尾科技大學 2016-07-31 2019-07-30
校品德教育推動委員會教師代表 其它 國立虎尾科技大學 2016-07-31 2017-07-30
院務會議委員代表 其它 國立虎尾科技大學 2016-07-31 2017-07-30
系儀器設備審查委員 其它 國立虎尾科技大學 2016-07-31 2017-07-30
校務會議議案委員會委員 其他 國立虎尾科技大學 2016-07-31 2017-07-30
院課程委員會委員 其它 國立虎尾科技大學 2015-07-31 2016-07-30
系課程委員會委員 其它 國立虎尾科技大學 2015-07-31 2016-07-30
年度 論文名稱
2024 陳冠妤, 半導體封裝廠產能規劃與機台配置最佳化之研究, 2024
2024 曾朝鴻, 考量需求不確定性之跨廠區產能擴充與最佳化規劃, 2024
2023 張文, 整合價值溪流圖與模擬方法於蛋糕生產線作業流程改善之研究, 2023
2023 陳姿宇, 考慮軟時窗限制與燃油消耗成本之物流配送路徑規劃之研究, 2023
2023 謝仁杰, 應用精實思維與限制理論於生產流程改善之研究-以雲林某醬油工廠為例, 2023
2023 徐婕瑀, 考慮燃油消耗與碳排成本下物流車輛配送路線之研究, 2023
2023 洪怡婷, 應用隨機規劃模式求解旅行時間不確定之城市物流配送規劃, 2023
2023 郭妤倢, 具有同時收送貨特性之城市物流配送規劃研究, 2023
2021 林育翎, 多趟次多艙種具時窗限制之物流配送派車策略最佳化模型研究, 2021
2021 蕭守心, 運用適應性遺傳演算法求解多趟次多艙種之冷鏈物流配送問題, 2021
2021 吳怡佳, 應用啟發式演算法於具時窗限制之多趟次車輛途程問題, 2021
2021 張晉, 具有不同拆卸作業關聯度下之多人工作站拆卸線平衡問題, 2021
2021 劉子寧, 考慮資源限制之多人工作站拆卸線平衡問題, 2021
2019 陳俞安, 考慮操作員工作熟練度下之拆卸線平衡問題, 2019
2019 李芷毓, 考量工作關聯度之拆卸線平衡問題, 2019
2019 林宜萱, 冷鏈物流車配送路徑規劃與派車最佳化問題之研究, 2019
2018 邱榮書, 多產品之多人工作站生產線平衡問題研究, 2018
陳韋伶, 考慮擴充瓶頸機台與附屬工具之中期產能規劃問題
黃柏翰, 考量數量不確定性下具有回收品與收購品之永續供應鏈網路設計規劃
施瓊雯, 以隨機規劃模式探討考量運輸風險下之綠色供應鏈網路設計問題
沈家豪, 應用啟發式演算法於多人工作站生產線平衡問題
黃紹茹, 考慮作業員配置效益下應用免疫遺傳演算法求解多人工作站生產線平衡問題
李佳嫈, 資源限制下多人工作站生產線平衡問題之研究
邱達暐, 應用兩階段隨機規劃探討半導體封裝產業之產能規劃問題
范筱瑤, 應用隨機規劃模式求解具有不確定性之產能配置與搬移規劃問題
陶氏玄絨, 隨機規劃模式求解半導體製造廠考量附屬資源下之產能擴充問題
黃大銘, 考慮操作員具有不同技術水準下之型IV生產線平衡問題研究
李芋瑩, 考慮操作員熟練度下多人工作站生產線平衡問題
陳姿伶, 半導體封裝測詴產業之中期產能配置模式
洪子育, 應用兩階段隨機規劃模式求解具有不確定性之永續供應鏈網路設計問題
林玉姍, 以模糊二階規劃求解晶圓代工廠中期產能規劃問題之研究
徐詩婷, 考慮資源擴充與需求不確定性之隨機產能規劃問題
吳伯軒, 應用模糊二階規劃求解中期產能規劃問題之研究─以TFT-LCD產業為例
活動名稱 活動類型 地點 開始時間 結束時間
系統模擬理論與產業應用案例探討 專題 2020-05-26 2020-05-26
系統模擬理論與產業應用案例探討 專題 2019-06-11 2019-06-11
系統模擬應用於產業案例之探討 專題 2019-11-29 2019-11-29
精實營建(Lean Construction) 專題 2017-11-17 2017-11-17
證照名稱 發照單位
ISO14064-1:2018 內部查證員及碳管理人員資質證書 領導力企業管理顧問有限公司
工業工程技師 考試院